LA RUCOLA – MELFI (PZ)

Installed power: 800 kW + 800 kW
Annual output: 1863 Mwh + 1576 Mwh
Entry into operation: 2012
Feed in Tariff: DM 06.07.12
Type of blades: Enercon E-53

MONTELUNGO – MELFI (PZ)

Installed power: 800 kW
Annual output: 972 Mwh
Entry into operation: 2012
Feed in Tariff: DM 06.07.12
Type of blades: Enercon E-53

BIZZARRO – RUVO DEL MONTE (PZ)

Installed power: 800 kW
Annual output: 1335 Mwh
Entry into operation: 2012
Feed in Tariff: DM 06.07.12
Type of blades: Enercon E-53